AZ HB 2756 Utilities/High Load Factor
AZ HB 2756 — Utilities; High Load Factor Customers (Data Center Ratepayer Cost Protection)
AZ · AZ HB2756 (Fifty-seventh Legislature — Second Regular Session, 2026)
- Status
- In effect
- Took effect
- September 12, 2026
- Applies to
- Arizona Corporation Commission (rulemaking obligation); large high-load-factor commercial customers subject to cost-responsibility allocation.
- Enforced by
- Arizona Corporation Commission
AZ HB 2756 would require the Arizona Corporation Commission (ACC) to establish cost-responsibility rules protecting residential and small-business ratepayers from electricity grid upgrade costs caused by large high-load-factor customers such as data centers. Companion bill to AZ HB 4158 (FY2027 data center tax moratorium). Awaiting primary-source verification of enacted status.
Who is protected: Arizona residential and small-business electricity ratepayers who would otherwise bear grid upgrade costs driven by large data center load growth.
Legal detail
Directs the Arizona Corporation Commission to promulgate rules allocating transmission and distribution infrastructure costs attributable to high-load-factor customers (defined by peak demand threshold) away from general ratepayers. Companion measure to AZ HB 4158 (data center TPT tax moratorium, effective FY2027). Enacted status and effective date unconfirmed pending azleg.gov access.
Key facts
| Jurisdiction | AZ |
|---|---|
| Level | State |
| Strength | Limited |
| Enacted | June 4, 2026 |
| Citation | AZ HB2756 (Fifty-seventh Legislature — Second Regular Session, 2026) |
| Topics | data-center siting and energy |
| Bill text | AZ HB2756 Engrossed bill text — 57th Legislature 2nd Regular Session (2026) |
Related data-center siting and energy rules elsewhere
- Superior WI Data Center Moratorium (1-year) · In effect
- Dane County WI Hyperscale Data Center Moratorium · In effect
- Madison WI Data Center Moratorium (1-year) · In effect
- Manitowoc County WI Data Center Moratorium · In effect
- WA SB 5982 (Data Center / Clean Energy) · In effect
- Dayton OH data center moratorium (180-day, Apr 2026) · In effect
See something wrong or out of date? Submit a correction. Every entry must carry a verifiable source.