FERC order directing PJM and other grid operators to reform tariffs on…

United States — FERC order directing PJM and other grid operators to reform tariffs on large-load (data center) transmission cost allocation (Docket RM26-4-000)
United States · FERC order directing PJM and other grid operators to reform tariffs on large-load (data center) transmission cost allocation (Docket RM26-4-000)

Status
Enacted (not yet in effect)
Applies to
United States

FERC ordered PJM and other regional grid operators to revise or defend their tariffs within 60 days to prevent existing ratepayers from being unlawfully charged for transmission upgrades required to serve large new loads such as AI data centers.

Who is protected: People subject to the measure.

Key facts

JurisdictionUnited States
LevelFederal
StrengthLimited
EnactedJune 18, 2026
CitationFERC order directing PJM and other grid operators to reform tariffs on large-load (data center) transmission cost allocation (Docket RM26-4-000)
Topicsdata-center siting and energy · consumer protection · AI disclosure and transparency · government use of AI
Agency pageFERC Directs Nation's Largest Grid Operator to Create New Rules to Embrace Innovation and Protect Consumers

More AI rules in United States

Related data-center siting and energy rules elsewhere

See something wrong or out of date? Submit a correction. Every entry must carry a verifiable source.