Eureka CA data center moratorium and 20,000 sq ft cap direction (2026)
Eureka, California — City Council Passes a 45-Day Moratorium on Data Center Siting, Then Two Weeks Later Directs Staff to Draft Zoning Admitting ONLY Data Centers of 20,000 Square Feet or Less in Industrial Areas and ONLY by Conditional Use Permit, on a Planning Record That One PG&E Substation Serving the City Is Already at Capacity (September 2026)
Eureka, CA · Eureka, Cal. — 45-day interim moratorium on data center siting (2026) and council direction for zoning capping data centers at 20,000 sq ft by conditional use permit in industrial areas
- Status
- In effect
- Expires
- October 17, 2026
- Applies to
- Data center developers seeking to site facilities in Eureka; under the directed zoning, facilities over 20,000 square feet would be excluded and smaller ones would require a conditional use permit in industrial areas
- Enforced by
- Eureka City Council; city planning department
Eureka has done two things in two weeks. First, the City Council passed a 45-DAY MORATORIUM on data center siting, effective immediately, to prevent development while staff write a long-term ordinance. Second, on September 15 the council weighed three regulatory options and directed staff to draft zoning that would allow only SMALL data centers — 20,000 SQUARE FEET OR SMALLER — and only in INDUSTRIAL AREAS, and only by CONDITIONAL USE PERMIT rather than by right, so that each one gets robust public review. That combination is more interesting than a flat ban, because it is an explicit decision about WHICH data centers a small city can absorb rather than a refusal to host any. The reasoning staff put on the record is the most useful part, and it is the clearest statement of the grid arithmetic anywhere in this dataset. Planning staffer Kenyon told the council that new data centers in 2026 commonly seek 50 to 100 megawatts, and the largest AI campuses can require hundreds or even more than 1,000 megawatts. For scale, PG&E uses roughly one to two kilowatts per housing unit as a planning estimate — so a ONE-MEGAWATT data center is roughly equivalent to the electrical demand of 500 to 1,000 HOMES. A 100-megawatt facility would therefore be on the order of 50,000 to 100,000 homes. Against that, PG&E told the city that ONE SUBSTATION SERVING EUREKA IS ALREADY AT CAPACITY, and another has about 10 MEGAWATTS of remaining capacity with a planned upgrade. A city with roughly 10 spare megawatts cannot host a facility that commonly asks for 50 to 100. The 20,000-square-foot cap is that arithmetic written into zoning.
Who is protected: Eureka residents in Humboldt County, California, and PG&E ratepayers served by the city's constrained substations
Legal detail
Eureka, Calif. (Humboldt County) — TWO LINKED ACTIONS. (1) 45-DAY MORATORIUM ON DATA CENTER SITING passed by the City Council approximately two weeks before the September 15, 2026 meeting, TAKING EFFECT IMMEDIATELY, to prevent development of such facilities while staff develop a long-term ordinance. The 45-day term and immediate effect identify this as a CAL. GOV. CODE § 65858 interim urgency ordinance (four-fifths vote; 45 days; extendable once by 10 months 15 days and once by 1 year). Cohort: Gilroy CA interim urgency data center moratorium (2026), Richmond CA 45-day data center moratorium (2026), Palm Springs Data Center Moratorium (2026). (2) POLICY DIRECTION, 2026-09-15: after weighing THREE REGULATORY OPTIONS the council DIRECTED STAFF to develop zoning regulations that would allow SMALL DATA CENTERS — 20,000 SQUARE FEET OR SMALLER — to be built IN INDUSTRIAL AREAS of the city, requiring a CONDITIONAL USE PERMIT RATHER THAN BEING PERMITTED OUTRIGHT, 'allowing for robust public review.' THE DIRECTION IS NOT ITSELF AN ADOPTED ORDINANCE — status `effective` on this entry attaches to THE MORATORIUM, not to the 20,000 sq ft cap, which remains staff direction. THE STAFF RECORD IS THE MOST SUBSTANTIVE GRID ANALYSIS INDEXED HERE. Planning staffer KENYON, quoted: 'New data centers in 2026 commonly seek 50 to 100 megawatts, and the largest AI campuses can require hundreds or even more than 1,000 megawatts.' 'To put those numbers in perspective, PG&E uses roughly one to two kilowatts per housing unit as a general planning estimate. So, a one-megawatt data center is roughly equivalent to the electrical demand associated with 500 to 1,000 homes.' 'PG&E has told us that ONE SUBSTATION SERVING EUREKA IS ALREADY AT CAPACITY, and one has about 10 MEGAWATTS OF REMAINING CAPACITY, with a planned upgrade to add more capacity.' Kenyon also distinguished facility types — basic data storage versus larger facilities hosting thousands of servers for AI and cryptocurrency mining — and noted that 'as they become larger in scale, data centers demand large continuous electrical loads and potentially large amounts of water for cooling.' THE POLICY FOLLOWS ARITHMETICALLY FROM THE CONSTRAINT: available headroom of roughly 10 MW against a typical ask of 50-100 MW makes a hyperscale facility physically unservable, and the 20,000 sq ft cap encodes that. THIS IS THE CAPACITY-DRIVEN COUNTERPART to the demand-driven caps elsewhere in this dataset, and it is a materially stronger evidentiary posture for defending a size limit than a bare policy preference. CONTRAST WITH THE FLAT-BAN COHORT (Irwindale CA data center ban ordinance (2026), Poway CA AI data center ban ordinance, first reading (2026), Monterey Park Data Center Ban (Measure NDC)): Eureka is calibrating to a measured constraint rather than excluding the use. expires_date 2026-10-17 IS COMPUTED from an ESTIMATED 2026-09-02 adoption ('two weeks' before September 15) and is UNRELIABLE — see notes.
Key facts
| Jurisdiction | Eureka, CA |
|---|---|
| Level | City / local |
| Strength | Moderate |
| Enacted | September 2, 2026 |
| Citation | Eureka, Cal. — 45-day interim moratorium on data center siting (2026) and council direction for zoning capping data centers at 20,000 sq ft by conditional use permit in industrial areas |
| Private right of action | No, agency enforcement only |
| Penalties | Data center siting is barred during the 45-day moratorium |
| Topics | data-center siting and energy · consumer protection · government use of AI |
| News report | Eureka City Council Advances Plan to Restrict Data Centers, Potentially Allowing Small Facilities in Industrial Areas — Lost Coast Outpost (Sept. 16, 2026) |
More AI rules in Eureka, CA
Related data-center siting and energy rules elsewhere
- Superior WI Data Center Moratorium (1-year) · In effect
- Dane County WI Hyperscale Data Center Moratorium · In effect
- Madison WI Data Center Moratorium (1-year) · In effect
- Manitowoc County WI Data Center Moratorium · In effect
- WA SB 5982 (Data Center / Clean Energy) · In effect
- Dayton OH data center moratorium (180-day, Apr 2026) · In effect
See something wrong or out of date? Submit a correction. Every entry must carry a verifiable source.