Oregon POWER Act

Oregon POWER Act (HB 3546, 2025): Data Center Ratepayer Protection
Oregon · Or. HB 3546 (2025) (POWER Act)

Status
In effect
Took effect
June 5, 2025
Applies to
Data centers, cryptocurrency miners, and other large energy users (>20 MW) served by investor-owned utilities
Enforced by
Oregon Public Utility Commission

Oregon's first-in-the-nation POWER Act makes data centers and crypto-mining operations pay for their own grid costs instead of shifting them onto household utility bills. Large users over 20 MW are placed in a separate rate class and must sign long-term contracts committing to minimum payments.

Who is protected: Residential and small-business utility ratepayers in Oregon

Legal detail

HB 3546 directs the Oregon PUC to create a stand-alone rate class for large loads (>20 MW) served by investor-owned utilities, with 10-year minimum take-or-pay contracts and cost attribution for power, capacity, and transmission.

Key facts

JurisdictionOregon
LevelState
StrengthLimited
EnactedJune 5, 2025
CitationOr. HB 3546 (2025) (POWER Act)
Private right of actionNo, agency enforcement only
PenaltiesContractual minimum payments, deposits, and penalties for exceeding contracted usage (per PUC implementation)
Topicsdata-center siting and energy · consumer protection
Bill textOregon Legislature passes 'POWER Act' — OPB

More AI rules in Oregon

Related data-center siting and energy rules elsewhere

See something wrong or out of date? Submit a correction. Every entry must carry a verifiable source.